Under the Accelerating Sustainable System Development Using Renewable Energy (ASSURE) project, supported by the Asian Development Bank (ADB), the Maldives is seeking contractors for the installation of 6 MWh capacity Flow Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) on 2 islands.
The BESS installations will support high penetration of renewable energy for the island grids and ensure the efficient operation of existing diesel generators required in a solar PV/Diesel hybrid generation mix. The BESS will be developed on an EPC (Engineering, Procurement, and Construction) basis with Operations and Maintenance support.
A pre-bid meeting will be held online, at 11:00 hours on 16th April 2024. Details are provided in the Bidding Documents. Interested developers shall submit applications for tender on or before 11:00 hours Maldivian Time on 14th May 2024. Interested parties can access bidding documents from: https://www.finance.gov.mv/tenders/procurement-of-design-supply-and-installation-of-flow-battery-energy-storage-systems-and-energy-management-systems-in-2-islands-in-maldives.